Landfill Management
Presently, the Landscape and Waste Management Agency manages 4 landfill sites in the entirety of Seychelles.
Providence Landfill, Mahe
The Providence landfill site comprises of 2 landfills namely; Providence 1 Landfill and Providence 2 Unit 1 Landfill. Providence 1 has been in operation since 1996 and does not have a bottom liner, or any environmental protection features, and is currently where waste disposal is being conducted on a daily basis.
In 2016, landfilling at Providence I ceased and began in Providence II Unit 1, however, due to a major landfill fire incident and continuous signs of fire, landfilling operations were deemed unfeasible in 2020.
The Providence II landfill (inclusive of Unit 1 and 2), funded by the European Union, was designed to cover an area of 7.9 ha with a void capacity of 710,000 m3. The new site was constructed as a sanitary landfill inclusive of a HDPE bottom liner, drainage channels for the collection of leachate, as well as a leachate pre-treatment facility. Needless to say, not all features are working at maximum capacity.
Despite being managed by the Agency and our dedicated landfill officers, the landfill is sub-contracted to a contractor for daily operation, which is inclusive of compaction and waste covering, as well as ground maintenance; as per our instructions.
Some waste types are segregated and allocated to designated areas, such as tyres, scrap metal and green waste.
The Providence landfill site has an operational weighbridge, from which loads entering the landfill are determined and customers are charged as per the approved landfill fees. The Providence landfill site is open on Mondays-Fridays from 8 AM- 16.00 PM, Saturdays from 8 AM-1PM, and Sundays from 8 AM-12PM.