List of Projects - Waste Management

Objectives: The construction of a boundary wall will physically demarcate the landfill boundary and aims to create a controlled and regulated environment, addressing concerns associated with informal waste picking on the landfill.

Description: This project will take place over several years and includes the construction of a boundary wall surrounding the Providence landfills, in order to create a controlled and restricted area.

Timeline: Phase 1 completed by end of 2024.

Funding: Funded by the Government of Seychelles at a cost of approximately SCR 3 million

Objectives: Construction of a resilient and sustainable access route to the Providence Landfill, which ensures continuity in landfill operations.

Description: The access roads to the Providence landfill are often impacted by adverse weather conditions, such as heavy rainfall, which in turn, hinder mobility and landfill operations. This project incorporates the planning and construction of a reinforced concrete road, inclusive of curbs and a drainage system, enabling uninterrupted access to the Providence landfill and management of surface run-off, throughout the year. Phase 1 is to cover an approximate liner distance of 280 m of a total 680 m.

Timeline: Completed by end of 2024.

Funding: Funded by the Government of Seychelles at a cost of approximately SCR 458,000

Objectives: Repair and upgrade the existing leachate pre-treatment plant to reduce the volume of leachate emanating into the surrounding environment.

Description: The project aims to rectify structural and operational deficiencies of the leachate pre-treatment plant, enhancing its efficiency and environmental impact. The project will be primarily focused on improving the infrastructure, as well as address key issues in the curren system, and will implement measures such as structural upgrades, operational optimizations, and advanced treatment technologies, to ensure that the facility is fully operational.

Timeline: Completed by the end of 2024.

Funding: Funded by the Government of Seychelles at a cost of SCR 1.5 million.

Objectives: Construction of a resilient boundary wall for the La Digue landfill which will reduce emanation of waste into the surrounding environment.

Description: This project includes the planning and construction of a reinforced concrete retaining wall along the La Digue landfill.

Timeline: Completed by the end of 2024.

Funding: Funded by the Government of Seychelles at a cost of SCR 1.5 million.

Objectives: Provide financial, strategic, and technical support to the Government of Seychelles in implementing solutions to address solid waste management challenges in a comprehensive and strategic manner.

Description: The Ministries of Finance and Agriculture propose a $5 million WBG investment to enhance solid waste management (SWM) and circularity in collaboration with key agencies. The project aims to reduce waste volume, extend landfill lifespan, and improve the entire waste value chain’s efficiency and performance. Components include capacity strengthening, financial sustainability planning, waste separation pilot, landfill modernization, material recovery facility construction, and circularity promotion through private sector engagement, legislation updates, and community outreach for waste reduction. The project aligns with climate mitigation goals and seeks to optimise waste practices for environmental impact reduction.

Download 8R’s Strategy

Timeline: N/A at present.

Funding: Soft loan of USD 5 million by the World Bank